Solid Waste


1 Study, Technical specifications Dossier Elaboration, Design and Implementation of Urban Solid Wastes Management Plans for 23 Municipalities

Suppling Networks


2 Final Study Drafting and Construction Project of Water Supply and Sewage System Enlargement and Improvement for the Macro-Project of Pachacutec, Municipal District of Ventanilla. Phase III
3 Final Study Drafting and Construction Project of WaterSupply and Sewage System Enlargement and Improvement for the Macro-Project of Pachacutec, Municipal District of Ventanilla. Phase II
4 Final Study Drafting and Construction Project of Water Supply and Sewage System Enlargement and Improvement for the Macro-Project of Pachacutec, Municipal District of Ventanilla. Phase I
5 Abreu & Lima Water Supply Executive Project
6 Preparation of Studies and Projects (Diagnosis, Preliminary Technical Study, Base Project & Complementary Studies) for Adequacy & Enlargement of Water Supply System of Goiana Municipality
7 Channeling Project to supply portable water to caceres from de Portaje reservoir (Caseres)

Waste Water Treatment


8 Alto Cotia Waste Water Treatment Plant (MetropolitanWater Business Unit): Engineering and Consultancy Services for Design and Alternatives Study for Sludge Removal in Decanters, Filter Wash water Recovery, Treatment System and Sludge Final Destination, Including Preliminary Environmental Impact Assessment
9 Construction Project and Detailed Engineering of Burgos Waste Water Treatment Plant
10 Construction Project of Villaperez Waste Water Treatment Plant. Enlargement and Improvement
11 Inspection Service, Surveillance and Monitoring Quality Control of the Contract for the Preparation of Design and Adequacy Works Execution of Biological Treatment for Nutrient Removal in Sur Oriental Waste Water Treatment Plant
12 Design of Treatment System, Reuse and Waste Water Removal at Hemobrás Industrial Plant

Sewerage/Outfall


13 Piaçabuçu Sanitation Municipal Plan
14 Penedo Sanitation Municipal Plan
15 Technical Assistance Services for Sanitation Works at Construction Project of Boadilla Del Monte. Boadilla Del Monte to Valenoso Waste Water Treatment Plant Collectors. Section A: by Pass From Bonanza Waste Water Pumping Station to Hebron Waste Water Treatment Plant
16 Technical Assistance Services for Works of Sanitation Construction Project in Boadilla Del Monte. Collectors From Boadilla Del Monte to Valenoso Waste Water Treatment Plant. Section B: Tajo River Waste Water Pumping Station Ebar to Cortijo Sur Urbanization

Drinking Water Treatment


17 Technical Assistance Services for Facultative Direction on Monitoring and Works Control in Safety and Health Coordination and Environmental Monitoring of Ablaneda Drinking Water Treatment Plant Improvement Project
18 Bamako Drinking Water Treatment Plant From Kabala
19 Executive Project for SludgeTreatment at Pirapama Drinking Water Treatment Plant

Master Planning


20 Engineering Detail Design & Construction Supervision of New Industrial Zone in Pre-Urban Madrid
21 Consultancy Services for Design & Construction Supervision of Extra Production Storage Space And Seat Including Residencies for Dagami Industries
22 Master Planning , Detail Design , Project Management & Construction Supervision of Infrastructure Work in New Industrial Market Bologna City Italy
23 Master Planning Designing & Construction supervision Management of Industrial Urbanization Works in Canicatti Municipality of Sicily
24 Electra Line-III-P Mark Infrastructure Works, Extension Of Existing Seat / Offices/Apartments & Development
25 Master plan – spain Hospital / medical research / residences / waterpark / mall / hotel / offices

Urban Planning


26 Infrastructural urban Design and Construction supervision of Pedemontana Lombarda Area

Microtunneling


27 Survey / assessment of existing Network Feasibility Study, Detail Design & Construction Supervision of the South-eastern Sewerage System through Tunnel Boring of Palermo City
28 Feasibility Study Detail design & Top Construction supervision & rehabilitation of Haret Harik Sewerage Tunnel (Phase II)
29 Water Conveyance Tunnel – Ghorveh-Dehgolan Dam and Tunnel Project.
30 Headrace Tunnel UMA OYA Multipurpose Project
31 Feasibility Study for Western Tehran Wastewater Tunnel

Water Management and Planning


32 Consultancy Services for Feasibility Study, Design and Construction Supervision of Groundwater Recharge Dams in Wilayat Ibri, Dhahira Governorate.
33 Feasibility study, preliminary and detailed design of protection scheme for Wadi Al Jifnain and Wadi Al Ansab. The project objective is to protect Muscat city from floods and has comprised the design of 7 dams and drainage structures. (2010 – 2014)
34 Geotechnical consultancy for Brissa Dam and Lake construction, Lebanon.
35 Technical assistance for the construction of the drinking Water Treatment Plant and Water Distribution System deriving from Kirandich dam, Kenya

Hydraulic Design


36 Hydraulic modelling and flood flow studies for the Adempona river and Ampahana dam in the framework of the Project “Management and control of RN5A construction works and Upgrading works of Antalaha Port”
37 Control and supervision of 7 Hydroelectric Dams (Beauregard, Brusson, Cignana, Goillet, Guillemore, Place Moulin, Perreres).in Val D’Aosta Region

Feasibility and Design


38 Techno-economic feasibility study and design of shinas Water front echno-economic feasibility study and design of shinas waterfront and urban development(sultanate of oman)
39 “Cala Dell’ Acqua” Environmental Re-Qualification And Marina Development (Ponza Island, Italy) Infrastructure, Master Plan And Preliminary Design
40 Termini imerese waterfront – Italy Urban planning& development

Detail Design


41 A12"roma- civitavecchia"/ roma "pontina" (torde'cenci) highway.lazio,italy
42 Upgrading works of Siracusa–Floridia highway National Road n°124, Sicily, ITALY
43 Abruzzo region( italy) Detailed design of the linking roads between campofelice plain and Altipiano delle rocche
44 Portogruaro bridge Venice, italy
45 Salerno-reggio calabria motorway ( italy ) Detailed design of the salerno-reggio calabria bridge

Design Review


46 Madagascar, sambava – antahala road Reconstruction of the national road 5a (80 km)

Construction Management


47 New Seat For Gruppo Bertolazzi Spa Offices / Headquarter

Architectural. Design and Structural Management


48 Villa salma / casablanca / morocco

Irrigation


49 "EI Loreto" Irrigation Communities Environmental impact study
50 Consultancy and Technical Assistance of sector III pumping station project, in Sagra- Torrijos irrigation area municipality of Bargas (Toledo)
51 Consultancy and technical assistance of the updating irrigation project in Canal de liebana (Salamance) irrigation community
52 Consultancy and technical assistance of the site management for the irrigation network improvement al updating of Languna de Antela irrigation community in Xinzo de Limia Orense.
53 Support for the irrigation Site- work management of Tierra de Tabara (Zamora) irrigation area.

Roads/Bridges


54 Writing of the improvement project for Villarrubia de los Ojos southeast sewer pipe

Town Planning


55 Architecture and Engineering Projects for sidewalk and roadway works execution in Tibau Do Sul, Brazil