Feasibility Study, Design and Resident Supervision of Water Supply and Sewerage Network and Waste Water Treatment Plant (20 MGD) for Wilayat Bahla

Services provided by Consultant


1 - Technical and economic feasibility, including the following tasks

  • - Data Collection, Topographic Survey and Physical survey of existing services and networks
  • - Hydraulic study
  • - Determination of the Characteristics of the Water Supply
  • - Study of the Treatment Plant
  • - Preliminary cost estimate

2 - Preliminary design

  • - Comprehensive system check
  • - Construction program

3 - Detailed design and Tender Documents

  • - Review and Analysis of the Preliminary design
  • - Final Design including design drawings, bill of quantities, etc…
  • - Preparation of Tender Documents for Construction Works
  • - Assistance to the Client during tendering stage and selection of suitable contractor

4 - Supervision Services during Construction until maintenance/defects liability period

The Preliminary Design and the Detailed Design have been approved by the Client

5 - IEE and EIA