Wastewater Collection and Wastewater Treatment for the Montana Town of Bulgaria (LOT2)

The objectives of the investment measures in the wastewater sector are:


  • - To decrease the direct discharge of untreated wastewater to surface water by construction of WWTP
  • - To optimize the work of WWTP’s by reduction of leakages in the sewer networks and other improvements
  • - To increase the population served by sewer networks;
  • - To increase the proportion of the population whose wastewater discharge receives full treatment

Services provided


  • - Masterplans of the town of Montana
  • - Feasibility Studies
  • - Preliminary Design
  • - Detailed Design
  • - Engineering GIS Based Survey
  • - Engineering SCADA enabled Design & Procurement
  • - Construction Supervision